Initial public release
GeoIntel release gates / Compile, test, contracts and builds (push) Successful in 1m49s
GeoIntel release gates / Python and npm vulnerability policy (push) Successful in 21s
GeoIntel release gates / Production AI image, SBOM and container scan (push) Successful in 5m39s
GeoIntel release gates / Deploy exact gated revision to Unraid (push) Failing after 58m43s

This commit is contained in:
Jens
2026-08-31 21:56:53 +02:00
commit faeb58ef6d
1386 changed files with 263203 additions and 0 deletions
@@ -0,0 +1,31 @@
# Next Pass After Day 1
If Day 1 succeeds, the next priority is not broad feature expansion. The next priority is the first true GeoAI/GIS capability.
## Preferred Day 2 sequence
1. GRB/reference adapter scaffold.
2. Raster tiling interface.
3. Detection model registry scaffold.
4. Deterministic detection fixture adapter.
5. Detection output as GeoJSON.
6. QA/QC overlap metrics against reference fixture.
7. Map overlay display.
## Why this sequence
It creates the first portfolio-relevant technical loop:
```text
Raster/Dataset -> Detection -> Geospatial output -> Reference comparison -> QA metrics -> Export
```
## Do not jump directly to
- full SAM integration;
- real Sentinel downloads;
- LiDAR processing;
- training studio;
- complex report generation.
Those need the Day 1 foundation and Day 2 detection/QA loop first.