Files
geointel/docs/15-tomorrow-execution/NEXT_PASS_AFTER_DAY_1.md
T
Jens faeb58ef6d
GeoIntel release gates / Compile, test, contracts and builds (push) Successful in 1m49s
GeoIntel release gates / Python and npm vulnerability policy (push) Successful in 21s
GeoIntel release gates / Production AI image, SBOM and container scan (push) Successful in 5m39s
GeoIntel release gates / Deploy exact gated revision to Unraid (push) Failing after 58m43s
Initial public release
2026-08-31 21:56:53 +02:00

840 B

Next Pass After Day 1

If Day 1 succeeds, the next priority is not broad feature expansion. The next priority is the first true GeoAI/GIS capability.

Preferred Day 2 sequence

  1. GRB/reference adapter scaffold.
  2. Raster tiling interface.
  3. Detection model registry scaffold.
  4. Deterministic detection fixture adapter.
  5. Detection output as GeoJSON.
  6. QA/QC overlap metrics against reference fixture.
  7. Map overlay display.

Why this sequence

It creates the first portfolio-relevant technical loop:

Raster/Dataset -> Detection -> Geospatial output -> Reference comparison -> QA metrics -> Export

Do not jump directly to

  • full SAM integration;
  • real Sentinel downloads;
  • LiDAR processing;
  • training studio;
  • complex report generation.

Those need the Day 1 foundation and Day 2 detection/QA loop first.