Files
geointel/docs/M6_FINAL_HANDOFF_TEMPLATE.md
T
Codex 6ea3586a3e
GeoIntel CI / docs-smoke (push) Has been cancelled
GeoIntel CI / contract-smoke (push) Has been cancelled
Initial GeoIntel V1 foundation
2026-06-16 23:36:32 +02:00

779 B

M6 Final Handoff Template

Codex must use this structure at the end of each build pass.

Pass name

PASS XX — <name>

Summary

Short summary of what was implemented.

Changed files

  • path/to/file: reason
  • path/to/file: reason

Acceptance criteria status

Criterion Status Notes
Criterion 1 Done/Partial/Blocked Notes

Tests run

command

Result:

pass/fail output summary

Manual verification

  • Step 1:
  • Step 2:
  • Expected result:

Known limitations

  • Limitation 1
  • Limitation 2

Risks

  • Risk 1
  • Risk 2

PASS XX — <name>

Do not forget

  • docs updated
  • TODO/backlog updated
  • no hidden placeholder completion
  • no architectural drift