Record live orthophoto release validation
GeoIntel CI / docs-smoke (push) Canceled after 0s
GeoIntel CI / contract-smoke (push) Canceled after 0s

This commit is contained in:
Codex
2026-07-17 02:36:44 +02:00
parent 0befca02f8
commit d9bc8fdbed
+7 -5
View File
@@ -9802,10 +9802,10 @@ Validation so far:
build. Target compile and Ruff checks also passed.
Live validation:
- Commits `06d05f0` and `0c2ebc1` were pushed, deployed through the repository
to Tower and validated against PostGIS 3.6. The all-in-one container became
healthy on port 1202 and passed migrations, schema/collation, API proxy and
browser shell checks.
- Commits `06d05f0`, `0c2ebc1` and final status correction `0befca0` were
pushed, deployed through the repository to Tower and validated against
PostGIS 3.6. The all-in-one container became healthy on port 1202 and passed
migrations, schema/collation, API proxy and browser shell checks.
- The packaged operator staged official edition `2025.04` for bbox
`5.110,51.180,5.117,51.185`: one 921,848-byte official WMS response became a
496x562, three-band EPSG:31370 GeoTIFF at an approximately one-metre grid.
@@ -9830,7 +9830,9 @@ Live validation:
coherent regional layer workflow, no horizontal overflow and no console
warnings or errors. A final live API audit found the generic source status
still selected a retained rolling label; source-freshness now prefers the
official edition without changing the 180-day review policy.
official edition without changing the 180-day review policy. The redeployed
Status workspace visibly reports `Editie: 2025.04`; a fresh official catalog
probe reports `local=remote=2025.04` and comparison `same`.
Next:
- Surface the existing release evidence read-only in the operator Status