Complete the V1 analysis handoff
This commit is contained in:
@@ -7,6 +7,21 @@
|
||||
|
||||
# Changelog
|
||||
|
||||
## Sprint 232 V1 user-flow completion (2026-07-17)
|
||||
|
||||
- Completed the primary end-user handoff from map analysis to a usable result,
|
||||
local AI question and downloads without exposing technical project or model
|
||||
setup in the normal path.
|
||||
- Added explicit metric names to the all-theme summary so values such as a
|
||||
station water level are no longer shown without their measured meaning.
|
||||
- Kept vector selections downloadable as GeoJSON and added JSON downloads for
|
||||
governed raster analyses and complete historical comparisons.
|
||||
- Added compact post-analysis actions for the local grounded Ollama assistant
|
||||
and the existing Downloads workspace, preserving the active area context.
|
||||
- Replaced the accumulated TODO lists as the product roadmap with one current
|
||||
V1 completion board; historical sprint checklists remain retained as
|
||||
implementation evidence.
|
||||
|
||||
## Sprint 231 Governed orthophoto release promotion (2026-07-17)
|
||||
|
||||
- Added an operator-only `plan -> stage -> review -> apply` coordinator for one
|
||||
|
||||
Reference in New Issue
Block a user