12 lines
542 B
Markdown
12 lines
542 B
Markdown
# Phase 1.0CE: extended-configure SDL materializer one-shot gate
|
|
|
|
Status: `EXTENDED_CONFIGURE_REQUEST_BOUND_ONE_OFFLINE_MATERIALIZATION_ALLOWED`
|
|
|
|
Date: 2026-07-30
|
|
|
|
The CD-authorized timeout-only correction is committed, pushed and hash-bound.
|
|
Host tests and validators pass, and the exact stage and build outputs are
|
|
absent. CE permits one exact offline entrypoint invocation with a 600-second
|
|
CMake configure bound. Scope still ends at `libSDL2.a`; no RetroArch target,
|
|
network or PS5 action is authorized, and failure consumes the attempt.
|