CI: require the native acceptance gate once #4

Closed
Jens wants to merge 0 commits from codex/one-pr-validation-gate into master
Owner

Use MobilityOps acceptance as the single required PR workflow and keep managed validation manual-only. Add concurrency cancellation so a newer PR commit retires every superseded backend/frontend/e2e job from the same workflow.

Use MobilityOps acceptance as the single required PR workflow and keep managed validation manual-only. Add concurrency cancellation so a newer PR commit retires every superseded backend/frontend/e2e job from the same workflow.
Jens added 1 commit 2026-08-29 03:45:01 +00:00
ci: keep one required pull-request gate
MobilityOps acceptance / backend (pull_request) Failing after 2m18s
MobilityOps acceptance / frontend (pull_request) Successful in 29s
MobilityOps acceptance / e2e (pull_request) Skipped
19df5f7508
Jens scheduled this pull request to auto merge when all checks succeed 2026-08-29 03:45:32 +00:00
Jens closed this pull request 2026-08-29 03:48:37 +00:00

Pull request closed

This pull request cannot be reopened because the branch was deleted.
Sign in to join this conversation.