chore: remove project-local Claude instructions
This commit is contained in:
@@ -1,61 +0,0 @@
|
||||
# Binding instructions for Claude
|
||||
|
||||
## Operating mode
|
||||
|
||||
Work autonomously. Do not ask the user product, architecture, naming, UI, scope or implementation questions already answered in this repository. Record a reasonable assumption in an ADR only when a genuine gap blocks implementation.
|
||||
|
||||
Use normal or medium reasoning for routine work. Reserve high reasoning for an actual cross-service design conflict or a persistent failure after evidence-driven debugging.
|
||||
|
||||
Continue from milestone to milestone until every acceptance criterion is satisfied. Do not stop merely because one milestone is complete.
|
||||
|
||||
## Token and tool efficiency
|
||||
|
||||
1. Read `START_HERE.md`, this file, `PROJECT_STATE.md` and `docs/15-build-plan.md` first.
|
||||
2. Read only the milestone-specific documents named in the build plan.
|
||||
3. Do not repeatedly reread all documentation.
|
||||
4. Keep explanations terse; spend effort on implementation and validation.
|
||||
5. Update `PROJECT_STATE.md` after each milestone with decisions, commands, evidence and the exact next action.
|
||||
6. Prefer focused file inspection and targeted tests over broad repository scans.
|
||||
7. Do not generate large speculative documents after implementation starts.
|
||||
|
||||
## Scope discipline
|
||||
|
||||
- Build the locked PoC only.
|
||||
- Do not add accounting, payments, public reservations, a generic CRM, inventory, HR, a second RAG stack, a separate MCP server or autonomous write actions.
|
||||
- Do not modify the RAGcore or ITWorx MCP Hub repositories. Integrate only through documented contracts and configurable adapters.
|
||||
- Keep critical business rules in MobilityOps code, not in n8n or prompts.
|
||||
- No direct MCP Hub or RAGcore access to the MobilityOps database.
|
||||
|
||||
## Product quality
|
||||
|
||||
- No dead buttons, empty routes, unexplained placeholders or hardcoded dashboard metrics.
|
||||
- Every visible number must derive from persisted data.
|
||||
- All important state changes must be audited.
|
||||
- AI must never invent an answer when RAGcore is unavailable or returns insufficient evidence.
|
||||
- Vehicle returns must commit locally even when n8n is unavailable; orchestration becomes pending and retryable.
|
||||
- External dependencies require timeouts, bounded retries, health state and graceful degradation.
|
||||
- Demo data must be clearly labelled synthetic.
|
||||
|
||||
## Engineering rules
|
||||
|
||||
- Backend: Python, FastAPI, SQLAlchemy 2, Alembic, PostgreSQL.
|
||||
- Frontend: React, TypeScript, Vite, accessible responsive UI.
|
||||
- Validation: Pydantic at API boundaries and database constraints for invariants.
|
||||
- Use UUID primary keys internally and stable human-readable public references.
|
||||
- Store UTC timestamps; render Europe/Brussels in the UI.
|
||||
- API paths start with `/api/v1`.
|
||||
- Use an outbox record for reliable post-commit n8n delivery.
|
||||
- Tests must cover domain rules, API contracts and the five-minute Playwright demo.
|
||||
- Generate and commit dependency lockfiles.
|
||||
|
||||
## Git workflow
|
||||
|
||||
Create one coherent commit per milestone after its validation passes. Suggested message format:
|
||||
|
||||
`M1: implement operational core`
|
||||
|
||||
Never rewrite already accepted milestone history unless necessary to fix a regression.
|
||||
|
||||
## Definition of done
|
||||
|
||||
The project is done only when `docs/14-testing-and-acceptance.md` passes from a clean checkout and `PROJECT_STATE.md` contains the final evidence summary.
|
||||
Reference in New Issue
Block a user