Next Pass After Day 1

If Day 1 succeeds, the next priority is not broad feature expansion. The next priority is the first true GeoAI/GIS capability.

Preferred Day 2 sequence

  1. GRB/reference adapter scaffold.
  2. Raster tiling interface.
  3. Detection model registry scaffold.
  4. Deterministic detection fixture adapter.
  5. Detection output as GeoJSON.
  6. QA/QC overlap metrics against reference fixture.
  7. Map overlay display.

Why this sequence

It creates the first portfolio-relevant technical loop:

Raster/Dataset -> Detection -> Geospatial output -> Reference comparison -> QA metrics -> Export

Do not jump directly to

  • full SAM integration;
  • real Sentinel downloads;
  • LiDAR processing;
  • training studio;
  • complex report generation.

Those need the Day 1 foundation and Day 2 detection/QA loop first.