840 B
840 B
Next Pass After Day 1
If Day 1 succeeds, the next priority is not broad feature expansion. The next priority is the first true GeoAI/GIS capability.
Preferred Day 2 sequence
- GRB/reference adapter scaffold.
- Raster tiling interface.
- Detection model registry scaffold.
- Deterministic detection fixture adapter.
- Detection output as GeoJSON.
- QA/QC overlap metrics against reference fixture.
- Map overlay display.
Why this sequence
It creates the first portfolio-relevant technical loop:
Raster/Dataset -> Detection -> Geospatial output -> Reference comparison -> QA metrics -> Export
Do not jump directly to
- full SAM integration;
- real Sentinel downloads;
- LiDAR processing;
- training studio;
- complex report generation.
Those need the Day 1 foundation and Day 2 detection/QA loop first.