Files
Jens faeb58ef6d
GeoIntel release gates / Compile, test, contracts and builds (push) Successful in 1m49s
GeoIntel release gates / Python and npm vulnerability policy (push) Successful in 21s
GeoIntel release gates / Production AI image, SBOM and container scan (push) Successful in 5m39s
GeoIntel release gates / Deploy exact gated revision to Unraid (push) Failing after 58m43s
Initial public release
2026-08-31 21:56:53 +02:00

987 B

Domain Model Contract

Core aggregates

Project

A project is an investigation workspace. It contains areas, datasets, analyses, and exports.

Area

A spatial polygon or selected administrative unit used to clip and analyze datasets.

Dataset

A source artifact or external reference. Datasets can be raster, vector, reference, model output, mask, or export.

AnalysisRun

A tracked execution of a pipeline such as detection, segmentation, QA, clipping, tiling, or index computation.

Detection

A model-derived feature, usually a georeferenced bounding box or polygon.

Segmentation

A mask-derived polygon or raster mask output.

QualityCheck

A comparison between model outputs and reference data such as GRB.

Geometry rules

  • Use SRID 4326 for API-level GeoJSON interchange unless explicitly documented.
  • Use projected CRS for area/length calculations when required.
  • Store original CRS metadata for every dataset.
  • Never calculate area in degrees.