GeoIntel release gates / Compile, test, contracts and builds (push) Successful in 1m49s
GeoIntel release gates / Python and npm vulnerability policy (push) Successful in 21s
GeoIntel release gates / Production AI image, SBOM and container scan (push) Successful in 5m39s
GeoIntel release gates / Deploy exact gated revision to Unraid (push) Failing after 58m43s
553 B
553 B
Dataset Manager
Objective
Implement upload/register/list/detail dataset flows, storage path policy, metadata status state machine, and file validation.
Required Inputs
- Read relevant docs in
docs/anddocs/18-ultra-prep/. - Keep V1 scope frozen.
Acceptance Criteria
- API or UI path works.
- Errors are typed.
- Tests cover happy path and one failure path.
- Documentation/TODO updated.
- No fake success states.
Out of Scope
- LiDAR
- Training Studio
- MLOps
- QGIS plugin
- Undocumented architecture changes