Finalize GeoIntel 1.0.0 release identity
GeoIntel release gates / Compile, test, contracts and builds (push) Canceled after 0s
GeoIntel release gates / Python and npm vulnerability policy (push) Canceled after 0s
GeoIntel release gates / GIS image, SBOM and container scan (push) Canceled after 0s

This commit is contained in:
Codex
2026-07-19 12:07:04 +02:00
parent 04b8373d7e
commit f045dec849
21 changed files with 94 additions and 62 deletions
+20
View File
@@ -1,3 +1,23 @@
## 2026-07-19 - GeoIntel 1.0.0 final release closeout
- Promoted the current clean `main` revision to semantic version `1.0.0` in
`VERSION`, backend/frontend package metadata, health/API examples and the
immutable Docker runtime identity. Historical RC entries remain unchanged.
- Re-ran the final repository release gate after the version promotion:
backend compile/tests, frontend unit tests/typecheck/build, readiness,
Alembic single-head/offline SQL and live-smoke syntax all pass.
- The final Tower image is tied to commit
`04b8373d7ece0f5eb29674507d718f0ea51ed5c4` and passed health, PostGIS
migration, proxy and browser runtime checks.
- Final live browser acceptance selected the Walloon golden area, activated
Waterbodem, analysed the full area and displayed real SPW mDNG metrics:
mean `74.55 m`, measured surface `22.69 ha`, coverage `7.07%`, and explicit
no-depth/no-volume limitations. No unrelated on-demand source acquisition
was triggered.
- Remaining boundaries are deliberate V1 limitations: MDK North Sea
analytical bathymetry remains not configured, water volume requires a
governed surface/datum/uncertainty contract, and YOLO remains human-reviewed.
## Autonomous RC program for Belgium and the Belgian North Sea (2026-07-17)
### Post-RC national data federation (2026-07-19)