Finalize GeoIntel 1.0.0 release identity
GeoIntel release gates / Compile, test, contracts and builds (push) Canceled after 0s
GeoIntel release gates / Python and npm vulnerability policy (push) Canceled after 0s
GeoIntel release gates / GIS image, SBOM and container scan (push) Canceled after 0s

This commit is contained in:
Codex
2026-07-19 12:07:04 +02:00
parent 04b8373d7e
commit f045dec849
21 changed files with 94 additions and 62 deletions
+11 -10
View File
@@ -4,7 +4,7 @@ Updated: 2026-07-19
## Current state
GeoIntel `v1.0.0-rc.1` is an accepted map-first GeoAI workbench for Belgium
GeoIntel `v1.0.0` is an accepted map-first GeoAI workbench for Belgium
and the legally distinct Belgian maritime scopes. It runs as an immutable
all-in-one Unraid image with PostGIS, FastAPI, React/MapLibre, local Ollama
integration and optional local YOLO/PyTorch inference.
@@ -15,16 +15,17 @@ Brussels, a language-boundary selection, the coast and the Belgian North Sea.
## Release status
There are no open release blockers for the signed `v1.0.0-rc.1` evidence set.
RC-0 through RC-11 are complete. Backup/restore, fresh install, upgrade,
rollback, fail-closed readiness, one Alembic head, API contracts, supply-chain
policy, responsive browser journeys and live PostGIS acceptance are proven.
There are no open release blockers for `v1.0.0`. RC-0 through RC-11 and the
post-RC national data closeout are complete. Backup/restore, fresh install,
upgrade, rollback, fail-closed readiness, one Alembic head, API contracts,
supply-chain policy, responsive browser journeys and live PostGIS acceptance
are proven against the final release candidate image.
The active post-RC candidate extends real source coverage. Its repository gate
passes 1,052 backend tests, 22 frontend tests, frontend typecheck/build,
one Alembic head and the complete readiness script. Its remaining acceptance
step is live SPW bathymetry persistence and browser verification before a new
immutable image is called releasable.
The final repository gate passes 1,052 backend tests, 22 frontend tests,
frontend typecheck/build, one Alembic head and the complete readiness script.
The live SPW bathymetry persistence and browser journey are accepted for the
final version: EPSG:3812 mDNG bed elevation, 2019-2022 survey period, bounded
coverage and no unsupported depth/volume inference.
## Operational product loop