fix(ci): restore release gates and contract baseline (fixes #4)
Managed validation / full (pull_request) Canceled after 0s
GeoIntel release gates / Compile, test, contracts and builds (pull_request) Canceled after 0s
GeoIntel release gates / Python and npm vulnerability policy (pull_request) Canceled after 0s
GeoIntel release gates / GIS image, SBOM and container scan (pull_request) Canceled after 0s
GeoIntel release gates / Python and npm vulnerability policy (push) Failing after 22s
GeoIntel release gates / Compile, test, contracts and builds (push) Waiting to run
GeoIntel release gates / GIS image, SBOM and container scan (push) Failing after 45s
Managed validation / full (pull_request) Canceled after 0s
GeoIntel release gates / Compile, test, contracts and builds (pull_request) Canceled after 0s
GeoIntel release gates / Python and npm vulnerability policy (pull_request) Canceled after 0s
GeoIntel release gates / GIS image, SBOM and container scan (pull_request) Canceled after 0s
GeoIntel release gates / Python and npm vulnerability policy (push) Failing after 22s
GeoIntel release gates / Compile, test, contracts and builds (push) Waiting to run
GeoIntel release gates / GIS image, SBOM and container scan (push) Failing after 45s
This commit is contained in:
@@ -1,5 +1,12 @@
|
||||
# GeoIntel TODO
|
||||
|
||||
## CI-onderhoud (2026-08-29)
|
||||
|
||||
- [x] Vervang de Gitea-incompatibele TruffleHog-actionwrapper.
|
||||
- [x] Pin de gepatchte Nano ID-transitive in de frontendlock.
|
||||
- [x] Maak de Syft-bron expliciet als lokaal Docker-image.
|
||||
- [ ] Bevestig de drie releasejobs op Gitea.
|
||||
|
||||
## Tweeschermwerkruimte (2026-08-21)
|
||||
|
||||
- [x] Voeg een gesynchroniseerde analyseconsole voor een tweede beeldscherm toe.
|
||||
|
||||
Reference in New Issue
Block a user