Unblock objective Belgian training loop
GeoIntel release gates / Compile, test, contracts and builds (push) Canceled after 0s
GeoIntel release gates / Python and npm vulnerability policy (push) Canceled after 0s
GeoIntel release gates / GIS image, SBOM and container scan (push) Canceled after 0s

This commit is contained in:
Jens
2026-07-29 15:31:55 +02:00
parent a5980127b9
commit e8530ae476
5 changed files with 92 additions and 7 deletions
+3
View File
@@ -971,6 +971,9 @@ This file now starts with the current implementation status. Older preparation/b
- [x] Replace rolling-mosaic training inputs with governed dated 2025 Flanders/Brussels and complete 2023 SPW imagery; retain exact flight-day limitations.
- [x] Reject positive labels over blank/no-data imagery and replace partial SPW 2024 coverage with the complete dated SPW 2023 campaign.
- [x] Exclude GRB/PICC features created after the corresponding dated imagery period while retaining auditable rejection evidence.
- [x] Allow the objective CUDA loop to consume an automatically clean `needs_human_review` corpus while keeping final human sign-off as a separate, mandatory promotion gate.
- [x] Evaluate the completed v36 YOLO11x checkpoint calibration-first on the rotated v30 holdouts; reject it before opening test/background because the regional calibration gate failed.
- [ ] Finish and assess the leak-free v37 YOLO11x failure-driven CUDA iteration; open test/background evidence only if every calibration gate passes.
# Sprint 229 - Visual release correction and Tower redeploy