docs: close Mol benchmark runtime pass
GeoIntel CI / docs-smoke (push) Canceled after 0s
GeoIntel CI / contract-smoke (push) Canceled after 0s

This commit is contained in:
Codex
2026-07-14 12:43:57 +02:00
parent 5db93a9530
commit e340b7f1ec
+6 -2
View File
@@ -7701,8 +7701,9 @@ Open:
## Tower benchmark evidence
- Deployed commit `9f61037` to the healthy all-in-one runtime and completed the
real benchmark with active asset
- Deployed implementation commit `9f61037`, completed the real benchmark and
then deployed final evidence/default-gate commit `5db93a9` to the healthy
all-in-one runtime with active asset
`geointel-building-yolov8s-smallbld-minpx3-img640-ft30-pt`, tile `512`,
overlap `64`, confidence `0.15` and canonical QA IoU `0.25`.
- Canonical results by holdout were: Achterbos F1 `0.6694`, Gompel `0.6564`,
@@ -7739,3 +7740,6 @@ Open:
complete the generated manual review decisions and curate confirmed small-
building positives plus confirmed visual hard negatives from the weakest
zones.
- Final internal-browser verification loaded the official Mol municipality
boundary over the OpenStreetMap road basemap from the persisted PostGIS
workspace. The live Tower page reported no console warnings or errors.