Phase 0.9A offline anti-brick threat model

Status: DESIGN_ONLY. Historical operational status: READ_ONLY_PREFLIGHT_BLOCKED.

This is an offline design review. It does not describe a proven PS5 filesystem, installation method, recovery method, path, syscall or switch primitive. No PS5 was contacted; no file was transferred, installed or executed; no target artifact was created. Host simulation is not hardware evidence.

Evidence boundary

The review uses only existing repository evidence:

  • immutable Phase-0.8 record and Phase-0.8R remediation contract;
  • the permanent artifact denylist;
  • Phase-0.7 offline identities for the hardened elfldr and controlled Payload Manager candidates;
  • stock elfldr and Payload Manager sizes and hashes as reference_only;
  • the offline rollback and installation review documents;
  • clean local source identities for hardened elfldr, controlled Payload Manager and the unchanged lifecycle-probe source.

Current on-device paths, mounts, object IDs, hashes, firmware behavior, processes, services, listeners, autoload state, backups and recovery paths remain unobserved. The byte-exact on-device Payload Manager backup remains a hard STOP gate.

Severity means:

  • CATASTROPHIC: can remove the only working launch/recovery path, destroy both live and rollback identities, run unverified code automatically, or make recovery depend on a failed component;
  • HIGH: can select or persist wrong/partial bytes, invalidate the evidence binding, or prevent controlled recovery;
  • MEDIUM: disrupts control or observation but does not alone prove loss of both live and recovery objects;
  • LOW: occurs before live mutation and should leave the old object intact, but still needs platform evidence.

Control profiles

A — wrong target

Possible damage is replacement of an unrelated or critical object. Before any future mutation, one no-follow stable object must bind literal path, mount ID, object ID, type, size and SHA-256, and the identity must be repeated immediately before mutation. AB-001, AB-003, AB-004 and AB-007 prevent the write. Recovery would require a separate verified backup and independent executor; neither is proven. Namespace and object-identity semantics remain UNPROVEN, so Phase 0.9A blocks.

ID Scenario Severity
TM-A-01 wrong path CATASTROPHIC
TM-A-02 wrong mountpoint CATASTROPHIC
TM-A-03 symlink, junction or other redirect CATASTROPHIC
TM-A-04 path resolves to another object after preflight CATASTROPHIC
TM-A-05 case or path normalization changes identity HIGH
TM-A-06 target is replaced between check and write CATASTROPHIC

B — wrong pre-image

Possible damage is treating modified or firmware-incompatible bytes as stock. The future evidence must bind firmware, manifest, stable object, size and digest in one current observation. AB-001 through AB-004 reject every partial match. Detection must happen before mutation; rollback is not a substitute. Current device identities and firmware runtime behavior remain UNPROVEN.

ID Scenario Severity
TM-B-01 live hash differs from stock reference HIGH
TM-B-02 live size differs HIGH
TM-B-03 object ID changes CATASTROPHIC
TM-B-04 firmware differs HIGH
TM-B-05 manifest belongs to another build HIGH
TM-B-06 modified installation is treated as stock CATASTROPHIC

C — backup failure

Possible damage is loss of all trusted rollback bytes. A backup must be created before staging, on a separate identity, then closed, reopened, re-identified and rehashed. Capacity, mapping and an independent recovery executor must be proven. AB-005, AB-006, AB-016 and AB-017 block mutation until this holds. The Payload Manager backup is currently a CATASTROPHIC hard blocker.

ID Scenario Severity
TM-C-01 backup missing CATASTROPHIC
TM-C-02 backup is the same object as live CATASTROPHIC
TM-C-03 backup is on the same vulnerable path CATASTROPHIC
TM-C-04 backup is partial CATASTROPHIC
TM-C-05 backup hash differs CATASTROPHIC
TM-C-06 backup cannot be reopened HIGH
TM-C-07 backup-to-target mapping is ambiguous CATASTROPHIC
TM-C-08 recovery tool depends on the replaced component CATASTROPHIC
TM-C-09 storage or metadata capacity is insufficient HIGH
TM-C-10 backup is created only after live mutation CATASTROPHIC

D — write and power loss

Possible damage is a missing, partial or ambiguous live identity. A safe design needs isolated staging, durable files and directory metadata, and one old-or-new atomic switch. AB-007 through AB-013 reject in-place overwrite and unproven switch semantics. No such PS5 primitive is proven.

ID Scenario Severity
TM-D-01 power loss before staging LOW
TM-D-02 power loss during staging HIGH
TM-D-03 power loss after staging before verification HIGH
TM-D-04 power loss during live switch CATASTROPHIC
TM-D-05 power loss immediately after live switch CATASTROPHIC
TM-D-06 power loss before directory metadata is durable CATASTROPHIC
TM-D-07 partial write CATASTROPHIC
TM-D-08 short write HIGH
TM-D-09 write error HIGH
TM-D-10 flush or fsync error CATASTROPHIC
TM-D-11 file bytes correct but directory not durable CATASTROPHIC
TM-D-12 new file has wrong ownership, mode or metadata HIGH

E — process and lifecycle

Possible damage is automatic launch of unverified bytes, stale mappings or a crash loop. A future observation must establish all relevant owners, instances, mappings, listeners, supervisors and authoritative autoload/retry state. AB-010, AB-013, AB-014 and AB-020 require quiescence and a later one-shot approval. Unknown topology blocks before switch.

ID Scenario Severity
TM-E-01 target executable is active HIGH
TM-E-02 multiple instances exist HIGH
TM-E-03 service restarts itself CATASTROPHIC
TM-E-04 listener conflict MEDIUM
TM-E-05 process holds old file or mappings HIGH
TM-E-06 watchdog or supervisor automatically restarts CATASTROPHIC
TM-E-07 autoload starts the candidate before verification CATASTROPHIC
TM-E-08 automatic retry creates a crash loop CATASTROPHIC

F — rollback failure

Possible damage is restoring wrong bytes to a wrong path, automatic execution or loss of the recovery executor. Rollback must bind the preverified backup, exact target mapping and independent executor. AB-006 and AB-015 through AB-017 require a separate approval and post-rollback identity proof. A failed rollback verification is CATASTROPHIC/BLOCKED, never a retry.

ID Scenario Severity
TM-F-01 wrong backup selected CATASTROPHIC
TM-F-02 wrong rollback target path CATASTROPHIC
TM-F-03 rollback interrupted CATASTROPHIC
TM-F-04 restored hash is wrong CATASTROPHIC
TM-F-05 rollback automatically starts a service CATASTROPHIC
TM-F-06 rollback works only if Payload Manager works CATASTROPHIC
TM-F-07 rollback works only if elfldr works CATASTROPHIC

G — operator error

Possible damage is a role swap, reused authority or combined loss of both runtime components. Component manifests and approvals must be bound to one device, firmware, action, hash, size and expiration. AB-018 through AB-020 prohibit a combined transaction, exclude the lifecycle probe and stop phase carryover. Component order is not guessed.

ID Scenario Severity
TM-G-01 hardened elfldr and Payload Manager are swapped CATASTROPHIC
TM-G-02 lifecycle probe is treated as installation candidate CATASTROPHIC
TM-G-03 wrong firmware or build is selected HIGH
TM-G-04 two installation phases are combined CATASTROPHIC
TM-G-05 approval for one component is reused for another HIGH
TM-G-06 stale manifest is used HIGH
TM-G-07 general READY overrides a specific blocker CATASTROPHIC

The item-specific reasons and machine bindings are in manifests/runtime/phase-0.9-anti-brick-design.json.

Decision

Every threat is detectable only under evidence contracts that are not yet satisfied on the PS5. The design is fail-closed and suitable for host review, but not for installation engineering on a device.

BLOCKER: NO PROVEN POWER-LOSS-SAFE SWITCH.