Files
ModelForge/docs/architecture/PROJECT_FIT_EVALUATION.md
T

1.8 KiB

Project-fit evaluation

ProjectFitEvidence is an immutable, digest-deduplicated statement about one project binding and, optionally, one capability deployment. It records environment, suite/dataset identity, case count, metrics, critical failures, blockers, recommendation, rationale, evidence fingerprint and one typed visual evidence class: OWNER_PHOTO, PUBLIC_PHYSICAL_CAPTURE or CATALOG_REFERENCE. The deployment must implement the binding's exact capability contract.

Allowed recommendations are PROMOTION_ELIGIBLE, KEEP_LAB, BLOCKED and REQUIRES_MORE_EVIDENCE. ModelForge rejects a production or promotion-eligible claim when blockers or critical failures are present, and it never turns evidence into a promotion action.

Engineering integration, project production fit, production validation and production action are separate fields. POKEVAULT_VISION_PRODUCTION_VALIDATION can become satisfied only from reviewed OWNER_PHOTO evidence. Public physical captures may support separately labelled robustness or printing evaluation; catalog references support only index/embedding/route integrity. Neither may be upgraded to owner-photo evidence. Production action is NONE in M11.

M11 records:

  • ExampleVision vision engineering: PASS; 21,775/21,775 available references, zero indexing failures, scoped shadow routing and QoS proven.
  • ExampleVision vision production fit: REQUIRES_MORE_EVIDENCE; owner-photo validation is DEFERRED_EXTERNAL_VALIDATION, zero reviewed owner-photo cases, production action NONE.
  • ExampleVision voice query: KEEP_LAB; four NL/EN TTS acceptance cases, all successful, with a small non-microphone dataset and measured word error rate of 0.380952.
  • OCR: no project-fit claim, because no safe, clearly licensed candidate reached execution.