3.2 KiB
Binding instructions for Claude
Operating mode
Work autonomously. Do not ask the user product, architecture, naming, UI, scope or implementation questions already answered in this repository. Record a reasonable assumption in an ADR only when a genuine gap blocks implementation.
Use normal or medium reasoning for routine work. Reserve high reasoning for an actual cross-service design conflict or a persistent failure after evidence-driven debugging.
Continue from milestone to milestone until every acceptance criterion is satisfied. Do not stop merely because one milestone is complete.
Token and tool efficiency
- Read
START_HERE.md, this file,PROJECT_STATE.mdanddocs/15-build-plan.mdfirst. - Read only the milestone-specific documents named in the build plan.
- Do not repeatedly reread all documentation.
- Keep explanations terse; spend effort on implementation and validation.
- Update
PROJECT_STATE.mdafter each milestone with decisions, commands, evidence and the exact next action. - Prefer focused file inspection and targeted tests over broad repository scans.
- Do not generate large speculative documents after implementation starts.
Scope discipline
- Build the locked PoC only.
- Do not add accounting, payments, public reservations, a generic CRM, inventory, HR, a second RAG stack, a separate MCP server or autonomous write actions.
- Do not modify the RAGcore or ITWorx MCP Hub repositories. Integrate only through documented contracts and configurable adapters.
- Keep critical business rules in MobilityOps code, not in n8n or prompts.
- No direct MCP Hub or RAGcore access to the MobilityOps database.
Product quality
- No dead buttons, empty routes, unexplained placeholders or hardcoded dashboard metrics.
- Every visible number must derive from persisted data.
- All important state changes must be audited.
- AI must never invent an answer when RAGcore is unavailable or returns insufficient evidence.
- Vehicle returns must commit locally even when n8n is unavailable; orchestration becomes pending and retryable.
- External dependencies require timeouts, bounded retries, health state and graceful degradation.
- Demo data must be clearly labelled synthetic.
Engineering rules
- Backend: Python, FastAPI, SQLAlchemy 2, Alembic, PostgreSQL.
- Frontend: React, TypeScript, Vite, accessible responsive UI.
- Validation: Pydantic at API boundaries and database constraints for invariants.
- Use UUID primary keys internally and stable human-readable public references.
- Store UTC timestamps; render Europe/Brussels in the UI.
- API paths start with
/api/v1. - Use an outbox record for reliable post-commit n8n delivery.
- Tests must cover domain rules, API contracts and the five-minute Playwright demo.
- Generate and commit dependency lockfiles.
Git workflow
Create one coherent commit per milestone after its validation passes. Suggested message format:
M1: implement operational core
Never rewrite already accepted milestone history unless necessary to fix a regression.
Definition of done
The project is done only when docs/14-testing-and-acceptance.md passes from a clean checkout and PROJECT_STATE.md contains the final evidence summary.