Commit Graph
4 Commits
Author SHA1 Message Date
NuklearRabbit acd8b82b09 M44: harden release integrity and assurance
MobilityOps acceptance / backend (push) Failing after 20s
MobilityOps acceptance / frontend (push) Successful in 26s
MobilityOps acceptance / e2e (push) Skipped
2026-08-21 18:32:02 +02:00
NuklearRabbit e5307a7c0f fix: derive demo-manifest MCP Hub status from real tool-call evidence
The demo manifest still reported the MCP Hub integration as operational purely
because MCP_HUB_REGISTRATION_ENABLED was set, while the integration status page
had already moved to evidence-based status in Batch 4. Registration is
catalog-driven on the Hub's side, so the flag alone proves nothing; reuse
derive_mcp_hub_status() so "operational" requires real recorded mcp_tool_request
calls.

No change to the MCP integration contract: the four read-only routes, service
token and client id handling, inbound X-Correlation-Id preservation, the locale
field on search-knowledge and the provider/correlation_id response fields were
verified as already correct at deployed revision 727c19a and left untouched.
2026-08-05 13:28:43 +00:00
NuklearRabbit 38f654b97a docs(demo): add demo concept, scenarios, data, guide and runbook docs
Documents the demo-productization work from this branch: the Northstar
Mobility fictional concept and scope, the five named scenarios and their
fixed records, the seed/date-anchoring strategy (including the real bug
it fixed), the in-app Demo Guide's design and the English-suggested-
questions decision, and an operational runbook covering 5/10-minute demo
flows, reset, Unraid redeploy and rollback. Updates README with current
test counts and pointers to the new docs.
2026-08-03 15:24:35 +02:00
NuklearRabbit 7c94eb9e87 docs(demo): audit current demo readiness gaps
Confirms the underlying data/business-logic is already demo-grade (Dutch/
Flemish names, .test emails, believable Belgian towns and RV brands; the
5 requested scenarios already exist as S1/S2/S4/S5/S6 in
docs/13-seed-and-demo-scenarios.md) -- the real gaps are structural: no
guided path, no visible fictional org identity (Northstar Mobility is
already the locked tenant name internally, just never shown), a
reproducible date-anchoring bug (seed dates are absolute and don't move
with reset -- BK-DEMO-RETURN's end date is already in the past as of
today), the knowledge page naming "RAGcore" directly instead of "demo
mode", technical-register integration-status labels, and no About page.
2026-08-03 12:54:27 +02:00