Commit Graph
5 Commits
Author SHA1 Message Date
NuklearRabbit 38f654b97a docs(demo): add demo concept, scenarios, data, guide and runbook docs
Documents the demo-productization work from this branch: the Northstar
Mobility fictional concept and scope, the five named scenarios and their
fixed records, the seed/date-anchoring strategy (including the real bug
it fixed), the in-app Demo Guide's design and the English-suggested-
questions decision, and an operational runbook covering 5/10-minute demo
flows, reset, Unraid redeploy and rollback. Updates README with current
test counts and pointers to the new docs.
2026-08-03 15:24:35 +02:00
NuklearRabbit e115031a57 feat(n8n): add scheduled quality-scan workflow
The original docs described two n8n workflows but the repository only ever
shipped one (return-processing); the sketched second workflow (knowledge
sync) depends on RAGcore, which isn't connected here, so it stays deferred.

Add POST /api/v1/integrations/n8n/scheduled-scan (X-Service-Token
protected, same pattern as the return callback), calling the same
run_scan() the manual "Run quality scan" UI action uses and recording a
service-actor data_quality_scan_run audit event. run_scan() already only
creates an issue for a condition without one open, so overlapping triggers
do no duplicate domain work.

n8n/mobilityops-scheduled-quality-scan.json (hourly schedule + manual test
trigger, both feeding the same HTTP call) ships "active": false so it can't
fire anywhere until deliberately published. Verified live against the
local n8n instance via the Manual test trigger: full green execution, and
the resulting data_quality_scan_run audit event (actor_type=service,
actor_label="n8n scheduled scan") confirms the real round trip, not just a
contract test. deploy/unraid/setup-scheduled-scan.sh mirrors the existing
return-workflow publish script for the shared Unraid n8n.
2026-08-02 06:59:17 +02:00
NuklearRabbit 1f292e14bb fix(deploy): reuse shared server n8n 2026-08-02 03:56:17 +02:00
NuklearRabbit 108b5d04fc M7: portfolio polish and final acceptance
Automated migrations on container startup (backend/entrypoint.sh), scripted n8n workflow activation (make n8n-setup), Playwright E2E test covering the full 9-step demo script (verified passing against the live stack, including the previously-unverified 360px responsive layout), evidence screenshots of all main pages, architecture diagram, and artifacts/evidence/final-summary.md with commit/commands/test counts/RAGcore and n8n evidence/MCP sample calls/known limitations/portfolio wording. Verified the complete clean-checkout path from a genuinely wiped-volumes state: automatic migrations, seed, 66 backend tests passing, and a live S1 return round-tripped through a freshly-activated n8n instance. Added .gitattributes to force LF line endings on shell scripts, preventing a real cross-platform breakage of entrypoint.sh's shebang.
2026-08-01 23:28:28 +02:00
NuklearRabbit 24188d9b10 Initial MobilityOps build pack (docs, contracts, scaffold) 2026-08-01 20:34:43 +02:00