Commit Graph
2 Commits
Author SHA1 Message Date
NuklearRabbit 4bf9afbeff Final acceptance audit: fix all mypy defects, verify full journey matrix and degraded modes
Ran a dedicated post-M7 release-readiness audit. Found and fixed the one real gap: mypy
was a declared dev dependency but had never been run in any milestone's validation loop.
Fixed all 43 pre-existing type errors it surfaced, including two genuine defensive-
programming gaps (unguarded Optional vehicle/customer lookups that could have crashed
with unhandled 500s instead of clean 404/401 responses) rather than suppressing them.
make lint now runs ruff + mypy; mypy reports zero errors across 44 source files.

Re-verified end to end against a genuinely wiped-volumes clean checkout: automatic
migrations, deterministic seed, 66/66 backend tests, and the full user-journey matrix
(login, dashboard, vehicle/booking detail, return workflow, invalid-mileage rejection,
data-quality review, duplicate-customer merge, audit trail, Knowledge Assistant, n8n,
MCP Hub) via curl and Playwright.

Live-verified both external-dependency degraded modes, not just unit tests: stopped n8n
mid-flow and confirmed a return still commits with the outbox event staying pending and
retrying with backoff, then self-healing to succeeded with zero manual intervention once
n8n came back; verified RAGcore's unavailable-degradation path against an unreachable
host. Added frontend/e2e/interactive-elements.spec.ts (11 tests covering every nav item,
filter, tab, and role boundary) alongside the existing demo script test — 12/12 e2e tests
passing.

Verified no secrets are committed (.env never tracked, clean git history scan) and
.env.example covers every operator-configurable setting. Confirmed no placeholders,
TODOs, fake responses, hardcoded metrics, or dead routes anywhere in the codebase.

Updated README.md with an honest integration-status section and PROJECT_STATE.md with
the full audit findings. Added artifacts/final-acceptance/summary.md as the authoritative
final evidence document (commands, results, URLs, demo access, integration status per
external dependency, known limitations, deployment instructions, five-minute demo flow).
2026-08-02 01:27:01 +02:00
NuklearRabbit 108b5d04fc M7: portfolio polish and final acceptance
Automated migrations on container startup (backend/entrypoint.sh), scripted n8n workflow activation (make n8n-setup), Playwright E2E test covering the full 9-step demo script (verified passing against the live stack, including the previously-unverified 360px responsive layout), evidence screenshots of all main pages, architecture diagram, and artifacts/evidence/final-summary.md with commit/commands/test counts/RAGcore and n8n evidence/MCP sample calls/known limitations/portfolio wording. Verified the complete clean-checkout path from a genuinely wiped-volumes state: automatic migrations, seed, 66 backend tests passing, and a live S1 return round-tripped through a freshly-activated n8n instance. Added .gitattributes to force LF line endings on shell scripts, preventing a real cross-platform breakage of entrypoint.sh's shebang.
2026-08-01 23:28:28 +02:00