34 — Product and implementation risk register

Rating

Likelihood and impact use Low, Medium or High. Release-blocking risks remain open until mitigated or explicitly accepted by the instance owner/product owner.

ID Risk Likelihood Impact Mitigation and evidence Release gate
R-001 Platform becomes a static prompt gallery Medium High Composer, profiles, provenance and deterministic export are mandatory before release Core composer acceptance
R-002 Codex invents architecture due to underspecified build pack Medium High Implementation defaults, reference SQL, OpenAPI, screen states and traceability Milestone 0 architecture review
R-003 Catalog size is overstated by unfinished content Medium High Only 28 P0 packages are publishable; P1/P2 remain labeled backlog Catalog cross-validation
R-004 Free-text conditions lead to unsafe dynamic evaluation Medium High Declarative condition AST; no eval or template helpers Condition parser/security tests
R-005 Prompt output changes across platforms Medium High RFC 8785 canonicalization, normalized text and property tests Cross-platform digest fixtures
R-006 Imported package escapes filesystem or exhausts resources Medium High path/symlink rejection, archive limits and streaming inspection Archive security suite
R-007 Gitea integration enables SSRF into private infrastructure Medium High deny-by-default network policy, exact allowlist, DNS/redirect revalidation SSRF contract tests
R-008 Integration token leaks into logs or prompts Low High encrypted envelope, redaction and no secret access in composer Secret redaction tests
R-009 Cross-workspace ID substitution exposes private content Medium High use-case authorization and negative integration matrix Authorization suite
R-010 First user takeover during exposed setup Medium High setup token, local-only fallback, database setup lock First-run concurrency/security test
R-011 Authentication library choice is weak or abandoned Low High maintained library decision ADR and security review in Milestone 0 Dependency/security review
R-012 PostgreSQL job queue loses or duplicates work Medium Medium leases, idempotency, retry classification and restart tests Worker recovery test
R-013 Built-in package update mutates historical runs Low High immutable version snapshots and digest references Historical reproduction test
R-014 Quality badges imply evidence that does not exist Medium High lifecycle/evidence policy and stale evaluation handling Quality-state tests
R-015 Premium UI work delays core correctness Medium Medium milestone ordering; domain/composer before polish Earlier gates cannot be skipped
R-016 UI feels generic despite specification Medium Medium screen-state contract, signature interactions and visual verification Design review and screenshots
R-017 Self-hosted backup omits encryption key Medium High separate-key warning and restore drill with key dependency Backup/restore acceptance
R-018 Database migration makes rollback impossible Medium High expand/migrate/contract and explicit rollback limits Migration rehearsal
R-019 Prompt injection enters policy sections through repository evidence Medium High normalized facts, fenced evidence, provenance and placement rules Adversarial composition fixtures
R-020 Search quality is poor without semantic search Medium Low full-text/trigram baseline and measured query set before adding vectors Search relevance evaluation
R-021 Playbook prompts become verbose and repetitive Medium Medium block budgets, lint rules and author review Representative output review
R-022 Raw repository command is suggested although unsafe Medium High command confirmation and safeForAgentSuggestion policy Profile/composer tests
R-023 Gitea API differences break discovery Medium Medium capability detection, adapter contract and per-capability degradation Versioned contract fixtures
R-024 Artifact retention deletes data required by history Low High reference-aware cleanup and immutable prompt storage Retention integration test
R-025 Product terminology confuses generated output with actual execution Medium Medium UI term “Generated task”; database/API run explained UX content review

Review cadence

  • review at the end of every milestone;
  • add risks discovered during implementation instead of hiding them in CURRENT_STATE.md;
  • close only with evidence;
  • accepted risks include owner, reason, review date and compensating controls.